Tuesday, August 18, 2009

Tub Surround in Centerville




This job became very interesting. We started out with tile falling off the wall, causing leaks into the basement. When we got to the job there was the small hole. We decided the best thing to do would be to rip the tiles and wall board down to the studs, install Hardibacker then a new tub surround.

No comments:

Post a Comment